History

1978 Estabilishment of Company
1979 Introduction of Automated Flashing Machine
1981 Development of Semi-automatic Support Ring Machine
1982 Moving HQ to Tokawa Industrial Park
1983 Introduction of Forming Machine for filaments for automotive lamps
1985 Development of Support Ring Machine for automotive lamps
Development of Automated Coil Forming Machine
1986 Finished development of Coiling Machine for C-6 filament for automotive headlamps.
1988 Development of Flashing Machine for double coil
1989 Development of Computer Controlled Pitch Altering Machine (Fist in industry)
Development of Computer Controlled Support Ring Machine
Completion of Second Factory
1990 Development of Automated Coiling and Sleeving Machine (Automatic Sleeve Assy) for H4 Coils
Completion of 3rd Factory
1994 Development of Automated Coiling Machine for C-8 Coils
1995 Start Development of Molten Head Tungsten Electrode for HID lamps.
1996 Start Sales of Electrode for Ceramic Metal Halide lamps.
1998 Start Development of Triple Coil for Toshiba
Development of Automatic Welding and Assemblying Machine for JD Type
1999 Development of Automatic Welding and Assemblying Machine for J Type
Start Massproduction of Triple Coil
2001 Development and Introduction of High Temperature Vacuum Heat Treatment Furnace (First Model)
Development of Automatic Electrode Welding Machine for Ceramic Metal Halide lamps
ISO 9002
2002 April Introduction of YAG Laser Welding Machine
2002 October Introduction of 2D CAD (AutoCAD LT)
2003 May Introduction of In-house Wireless LAN
2003 May Development and Introduction of High Temperature Vacuum Heat Treatment Furnace (2nd Generation)
2003 April Introdution of four NC Lathe Machine
2003 June ISO 9001
2003 July Introduction of New SEM
2004 Introduction of Automated Welding Machine for mountings of JD Type
Completion of 4th Factory
Introduction of three additional LC Lathe Machine
2004 July Introduction of Q-MASS
2005 February Development and Introduction of Automated Coiling Machine of C-801
2005 March Introduction of additional Vacuum Heat Treatment Furnace
2005 May Development and Introduction of Automatic Molten Head Machine for Cathod Electrodes
2005 September Completion of New Factory
2005 September Introduction of additional High Temperature Vacuum Heat Treatment Furnace
2006 April Development and Introduction of Centerless Grinder Machine (Infeed type)
Introduction of additional Ultrasonic Cleaning Machine
2006 May Introduction of Flat Surface Grinding Machine
2006 August Introduction of Heat Suction Dryer
2007 January Introduction of addittional Laser Welding Machine
2007 March ISO 14001
2007 May Introduction of 3D CAD (Autodesk : Inventor)
2007 July Introduction of addittional Laser Welding Machine
2007 October Introduction of Waste Solvent Recycling Machine
Introduction of MIG Welding Machine
2008 May Introduction of Hydraulic Press for Powder Molding
2009 January Award for Excellent Factory by Kanagawa Prefecture
2009 April Introduction of Injection Molding Machine
Introduction of Extrusion Molding Machine
Introduction of Powder Mixing Machine
Introduction of Neadling Machine
2009 June Subsidy for Small and Medium Size Enterprises on New Product Development by Kanagawa Prefecture (8 million yen)
Subsidy for Small and Medium Size Enterprises on New Product Development by Hadano City (1 million yen)
2009 September Development and Introduction of Production Management System
2009 October Development and Introduction of Automated Welding Machine for Ceramic Metal Halide Electrodes
2010 January Development and Introduction of Centerless Grinder (throughfeed type)
2010 February Introduction of High Temperature Multiple Atmosphere Furnace
Introduction of Hydrogen Furnace (Degreasing Furnace)
2010 October Introduction of Class 100 Clean Bench
2011 April Development and Introduction of Automated Hot Press Machine
Introduction of NC Lathe for large diameter materials
Introduction of Dryer for Baking Finishing
Introduction of Millimeter Wave Heating Machine
Introduction of Round Granulator Machine
2011 May Development and Introduction of Automatic Coiling Machine for C-6
Development and Introduction of Automatic
2011 September Introduction of 3D Machining Center
Introduction of Image Measuring Machine
Introduction or additional Flat Surface Grinding Machine
Introduction of additional Laser Welding Machine
2012 December "Kanagawa Standard" Certificate
2013 April Introduction of additional Laser Welding Machine
2013 November Introduction of 3D CAD (Solidworks)
2014 February Development and Introduction of Automatic Laser Melting and Inspecting Machine
2014 June Subsidy for Small and Medium Size Enterprises on New Product Development by Kanagawa Prefecture (For Market Development)
2014 October Introduction of additional Laser Welding Machine
2015 March Development and Introduction of Cost Management and Production Management System Software
2015 April Development and Introduction of Automated Rod-Coil Assembly Machine
2015 August Development and Introduction of Precision Automatic Cutting Machine
2016 March Additional purchase of wire-cut EDM machine
2016 April Painting and maintenance of exterior wall completed
2016 April Additional development and installation of automated welding and inspection machine completed
2016 April Additional purchase of laser welding machine