History
1978 | Estabilishment of Company |
---|---|
1979 | Introduction of Automated Flashing Machine |
1981 | Development of Semi-automatic Support Ring Machine |
1982 | Moving HQ to Tokawa Industrial Park |
1983 | Introduction of Forming Machine for filaments for automotive lamps |
1985 |
Development of Support Ring Machine for automotive lamps Development of Automated Coil Forming Machine |
1986 | Finished development of Coiling Machine for C-6 filament for automotive headlamps. |
1988 | Development of Flashing Machine for double coil |
1989 |
Development of Computer Controlled Pitch Altering Machine (Fist in industry) Development of Computer Controlled Support Ring Machine Completion of Second Factory |
1990 |
Development of Automated Coiling and Sleeving Machine (Automatic Sleeve Assy) for H4 Coils Completion of 3rd Factory |
1994 | Development of Automated Coiling Machine for C-8 Coils |
1995 | Start Development of Molten Head Tungsten Electrode for HID lamps. |
1996 | Start Sales of Electrode for Ceramic Metal Halide lamps. |
1998 |
Start Development of Triple Coil for Toshiba Development of Automatic Welding and Assemblying Machine for JD Type |
1999 |
Development of Automatic Welding and Assemblying Machine for J Type Start Massproduction of Triple Coil |
2001 |
Development and Introduction of High Temperature Vacuum Heat Treatment Furnace (First Model) Development of Automatic Electrode Welding Machine for Ceramic Metal Halide lamps ISO 9002 |
2002 April | Introduction of YAG Laser Welding Machine |
2002 October | Introduction of 2D CAD (AutoCAD LT) |
2003 May | Introduction of In-house Wireless LAN |
2003 May | Development and Introduction of High Temperature Vacuum Heat Treatment Furnace (2nd Generation) |
2003 April | Introdution of four NC Lathe Machine |
2003 June | ISO 9001 |
2003 July | Introduction of New SEM |
2004 |
Introduction of Automated Welding Machine for mountings of JD Type Completion of 4th Factory Introduction of three additional LC Lathe Machine |
2004 July | Introduction of Q-MASS |
2005 February | Development and Introduction of Automated Coiling Machine of C-801 |
2005 March | Introduction of additional Vacuum Heat Treatment Furnace |
2005 May | Development and Introduction of Automatic Molten Head Machine for Cathod Electrodes |
2005 September | Completion of New Factory |
2005 September | Introduction of additional High Temperature Vacuum Heat Treatment Furnace |
2006 April |
Development and Introduction of Centerless Grinder Machine (Infeed type) Introduction of additional Ultrasonic Cleaning Machine |
2006 May | Introduction of Flat Surface Grinding Machine |
2006 August | Introduction of Heat Suction Dryer |
2007 January | Introduction of addittional Laser Welding Machine |
2007 March | ISO 14001 |
2007 May | Introduction of 3D CAD (Autodesk : Inventor) |
2007 July | Introduction of addittional Laser Welding Machine |
2007 October |
Introduction of Waste Solvent Recycling Machine Introduction of MIG Welding Machine |
2008 May | Introduction of Hydraulic Press for Powder Molding |
2009 January | Award for Excellent Factory by Kanagawa Prefecture |
2009 April |
Introduction of Injection Molding Machine Introduction of Extrusion Molding Machine Introduction of Powder Mixing Machine Introduction of Neadling Machine |
2009 June |
Subsidy for Small and Medium Size Enterprises on New Product Development by Kanagawa Prefecture (8 million yen) Subsidy for Small and Medium Size Enterprises on New Product Development by Hadano City (1 million yen) |
2009 September | Development and Introduction of Production Management System |
2009 October | Development and Introduction of Automated Welding Machine for Ceramic Metal Halide Electrodes |
2010 January | Development and Introduction of Centerless Grinder (throughfeed type) |
2010 February |
Introduction of High Temperature Multiple Atmosphere Furnace Introduction of Hydrogen Furnace (Degreasing Furnace) |
2010 October | Introduction of Class 100 Clean Bench |
2011 April |
Development and Introduction of Automated Hot Press Machine Introduction of NC Lathe for large diameter materials Introduction of Dryer for Baking Finishing Introduction of Millimeter Wave Heating Machine Introduction of Round Granulator Machine |
2011 May |
Development and Introduction of Automatic Coiling Machine for C-6 Development and Introduction of Automatic |
2011 September |
Introduction of 3D Machining Center Introduction of Image Measuring Machine Introduction or additional Flat Surface Grinding Machine Introduction of additional Laser Welding Machine |
2012 December | "Kanagawa Standard" Certificate |
2013 April | Introduction of additional Laser Welding Machine |
2013 November | Introduction of 3D CAD (Solidworks) |
2014 February | Development and Introduction of Automatic Laser Melting and Inspecting Machine |
2014 June | Subsidy for Small and Medium Size Enterprises on New Product Development by Kanagawa Prefecture (For Market Development) |
2014 October | Introduction of additional Laser Welding Machine |
2015 March | Development and Introduction of Cost Management and Production Management System Software |
2015 April | Development and Introduction of Automated Rod-Coil Assembly Machine |
2015 August | Development and Introduction of Precision Automatic Cutting Machine |
2016 March | Additional purchase of wire-cut EDM machine |
2016 April | Painting and maintenance of exterior wall completed |
2016 April | Additional development and installation of automated welding and inspection machine completed |
2016 April | Additional purchase of laser welding machine |